GRAND PRAIRIE ISD
Technology Plan

2006 - 2009




DAVID BARBOSA

SUPERINTENDENT


DISTRICT PROFILE

ESC Region 10
City, State Zip GRAND PRAIRIE, TX 750531170
Phone (972) 264-6141
Fax (972) 237-5440
County District Number 057910

Number of Campuses 35
Total Student Enrollment 23927
District Size 10,000 - 24,999
Percent Econ. Disadvantaged 58.78%

Technology Expenditures $5,478,200.00
Technology budgets
reported in plan by category
Teaching and Learning Budget $841,000.00
Educator Preparation and Development Budget $840,700.00
Administration and Support Services Budget $1,539,000.00
Infrastructure for Technology Budget $2,257,500.00
Total: $5,478,200.00
Technology Expenditure
Per Pupil
$228.95
Number of Campuses
with Direct Connection to Internet
35
Percentage of Campuses
with Direct Connection to Internet
100.00%
Number of Classrooms
with Direct Connection to Internet
1412
Percentage of Classrooms
with Direct Connection to Internet
100.00%
Computer/Student Ratio 6 student(s) for every computer
Computer/Teacher Ratio 1 teacher(s) for every computer
Number of campuses that need to
complete the Texas Campus STaR Chart
35
Percentage of campuses that have
completed the Texas Campus STaR Chart
100.00 %

Plan Introduction

Plan Last Edited 04/03/2006

Plan status: approved
Years Included in the Plan: 2006 - 2009
Number of years covered by the plan: 3
Years Approved for the Plan: 2006 - 2009
Number of approved years: 3

Technology Planning Committee
Invited Members:

Alisha Crumley - Principal, Whitt Elementary
Belinda Jacks - District Library Facilitator
Bob O'Neal - City of Grand Prairie, IT Director
Chad Pope - Teacher, Austin Elementary
Charles Lester - Principal, Truman Middle School
Greg Vernon - Executive Director of Facilities
Jennifer Oliver - Teacher, Reagan Middle School
Kerry Rapier - Principal, Lamar AEP
Michelle Smith - Teacher, Adams Middle School
Pat Blanchard - Principal, Zavala Elementary
Shane Thorton - Teacher, SGPHS 9th Grade Center
Sharon Manterola - Lead Technology Facilitator
Sheri Herod - Web Master
Scott Grey - Parent
Sylvia Chastain - Teacher, Travis Elementary
Vicki Bridges - Principal, SGPHS
Vince Rohloff - Teacher/Parent, Reagan Middle School
Lyle DuBus - Executive Director of Technology and Information                                                                                    

Executive Summary

The Grand Prairie Independent School District technology plan is intended to encompass all aspects of technology use of educational and administrative technology services in the district for the next three years. The plan is designed to be in alignment with district plans and vision. The technology used in the district’s instructional and operational setting is quite dynamic. Since new technologies become available almost daily, this plan is intended to be a process-laden framework, on which the school district can build, and is not meant to be static and unresponsive to innovation and the changing needs of students and community. As with all educational planning, the proposals set forth in this plan are heavily dependent on the community’s support of the capital outlay determined through a budget process at the district level as well as through external means such as grant funding.

The committee is excited by a district administration that has a vision of and a dedication to the increased utilization of available technology in all aspects the educational processes contained within the Grand Prairie Independent School District.

The following philosophical statements were considered essential during the planning process:

Curriculum drives technology, The Grand Prairie Independent School District’s instructional program, technology plan, and professional development are intertwined.

The following documents were used to assist with the planning process:

Planning and Policies for Technology in Education: A Compendium
Texas Technology TEKS
CEO Forums Report on Educational Technology
Texas STAR Report

A shared decision-making process allowed all committee members and staff to have a voice in the priorities and goals. The committee emphasized the need for full-time technology help at the point of need at the campus level, enhanced staff development opportunities, TEKS alignment into the curriculum, and a technology replacement/procurement plan to reach state recommendations for student/computer ratios

Needs Assessment

Assessment Process:
District technology needs were addressed by analysis the district’s hardware/software inventory. Department heads in technology submitted to the Executive Director of Technology a full accounting of their area including instructional technology, network services, data services, and repair/support. Work order and staff development trends were compiled and studied.

Existing Conditions:
Statement of Existing Conditions


A needs assessment utilizing teacher/student surveys, interviews, inventories, and the Texas STaR Chart was conducted to analyze the current status of technology in the district and determine future needs. Items analyzed included: infrastructure, hardware, software, programs, student achievement, technology resources, staff development, and technical support. Findings from this needs analysis are as follows.

The following technology is currently in place:

District-Wide

Direct connection to the Internet is via a 30meg connection.

District web site and intranet is in place providing district information and instructional services.

Web site training is provided to campus web teams and coordinated through the librarian on campus

Written procedures are in place on acceptable use of the Internet, network management and equipment donations.

Distance learning labs available at 2 sites for student, staff, and community members.

T-Star satellite receiver is used for district training and information.

District Internet is filtered with 8e6 enterprise filtering. The following categories are blocked with the filter:

Alcohol
Anarchy
Chat
Criminal Skills
Cults/Gothic
Drugs
Gambling
Games
Hate and Discrimination
Obscene/Tasteless
Personals/Dating
Pornography
R-Rated
Web-based Email
Web-based Proxies and Anonymizers
Web-based Newsgroups

All teachers have a Pentium III or Pentium IV computer with a switched 100 base-T connection with fiber into their classrooms, and a TV for computer projection. Forty percent of all teachers have 3 additional workstations for classroom student use.

On-line card catalog, automated checkout, Internet connections, and Texas Library Connection are available at all libraries.

All campuses have at least 3 computer projectors for classroom checkout.

District employees have email accounts and network storage space.

One executive-level administrator, four network managers, six technicians, three phone support personnel, one help desk personnel, two database analysts, one middle school technology facilitator, one instructional web manager deployed centrally, and one lead instructional technology facilitator.

At least an 8-strand fiber network to all campuses.

Technology TEKS are broken down by grade-level and teachers are expected to cover relevant material integrated into their lessons.

High Schools

The following courses are offered:
Computer Science I, Computer Multimedia and Animation Technology, Business Computer Information Systems I and II, Business Computer Programming, Telecommunications and Networking, Business Image Management and Multimedia, Technology Systems, A+ Computer Repair, Cisco Academy.

Mobile computer labs are available for checkout.

Students collaborate on campus web sites.

Four open access labs for students and teachers.

One full-time instructional technology facilitator

One full-time support person.

Middle Schools

Mobile computer labs are available for checkout.

Two open access labs for students and teachers.

One centrally deployed instructional technology facilitator.

Stipend campus-based support.

Elementary Schools

Two open access labs for students and teachers.

Elementary facilitators are responsible for support and training for 2.5 campuses.

One campus has a full-time Technology/Science Facilitator

Telecommunication Services
Currently, all students and staff in the school district have access to the Internet via a direct connection and the district own fiber optic network. The district WAN services all facilities both education and support. All facilities have LANs and support file sharing, network storage, and printing. All classrooms have telephones (four IP based)

Accessibility
GPISD is aware of the critical need for broader technology access, and will ensure equitable access and use of technology by making it readily accessible to all for use when it is needed.

Teachers and administrators use technology to enhance achievement of all students by use of the TEKS for curriculum and alignment of the districts curriculum to these state guidelines. The district uses email and other administrative tools to increase communication. Also, software is purchased using local, state and federal funds for students for TAAS/TAKS remediation. The technology department ensures equity to all campuses with centralized purchasing and Internet delivery. Site based decision making is used for many decisions regarding achievement but the Technology Department does consult and recommend on the campus improvement plan to make sure district goals are being meet regarding achievement.

Hands-on experiences with technology and high quality content are assured with the use of consistent access in all sites. Standards have been set from the technology department regarding access for all schools and content is measured against research-based measures to ensure achievement is seen. Technology Facilitators work with all teachers through required training to make sure students are given technology rich lessons. Access to computers starts in Pre-Kindergarten and continues until graduation at all sites and is monitored by the Executive Director of Technology.


Inventory

The latest inventory of current technology available for student use in GPISD as of January 2006 is 6 to 1. This number includes only current, non-obsolete network capable student computers. Administrative computers and file servers are not included in the number.

Technology Needs:
Needs from the analysis showed the primary concern of staff was the lack of additional staffing as the district continues to grow. Also, the continued growth in the district (1000-2000 students) per year will to continue to stress existing staff and highlight the need for additional personal. Also the need for a continued instructional technology alignment with district’s curriculum was noted. Student and community computer access was also seen as a need for the district.

Goals, Objectives, and Strategies

GOAL 1: Increase the impact of technology staff development on instruction
OBJECTIVE 1.1:   Emphasize lesson development in District technology staff development sessions

Budget Amount $136,000.00
LRPT category: Teaching and Learning

E-Rate Correlates: ER02
NCLB Correlates: 01, 03, 04a, 04b, 07, 08, 11

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  1.1.1: Specify in technology training manuals which content area and Technology Applications TEKS will be met in each activity

LEA LRPT Correlates: EP03, EP04, EP05, EP08, TL01, TL02, TL05, TL06, TL07, TL08

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator TEKS are well documented in training manuals, lab signup calendars, and lessons
  1.1.2: Model the development of engaging lessons

LEA LRPT Correlates: EP03, EP04, EP05, EP08, EP09

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Lesson plan development is included in District Technology sessions as appropriate. Lab use data reveals increase in standards-based learning activities using campus technologies.
  1.1.3: Allow participants to create and exchange ideas in a lesson plan database

LEA LRPT Correlates: EP03, EP04, EP05, EP07, EP09, TL01, TL03, TL05, TL07, TL08

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Lesson plan database contains expanding number and variety of instructional ideas, resources, and suggestions.
OBJECTIVE 1.2:   Provide follow-up to Technology sessions

Budget Amount $555,000.00
LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02
NCLB Correlates: 04b, 07

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  1.2.1: Increase the number of “Part 2” Technology sessions that are offered

LEA LRPT Correlates: EP03, EP04, EP05, EP08, EP09, TL03, TL05, TL07, TL08, TL19

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator "Part 2" sessions increase in Technology staff development course offerings
  1.2.2: Provide forums for the exchange of ideas and information related to the infusion of technologies with lessons and other classroom learning activities.

LEA LRPT Correlates: EP04, EP05, EP08, EP09, EP12, TL05, TL08, TL19, TL20

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Lesson plan database contains expanding number and variety of instructional ideas, resources, and suggestions. Successful lessons are showcased in meetings, newsletters, webpages, etc
OBJECTIVE 1.3:   Broaden the scope of Technology staff development to meet needs of 21st century learners

Budget Amount $255,200.00
LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02
NCLB Correlates: 01, 02, 04a, 04b, 07, 08

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  1.3.1: Promote the use of emerging technologies where appropriate

LEA LRPT Correlates: EP03, EP04, EP05, EP08, EP09, EP11, TL01, TL02, TL03, TL05, TL07, TL08, TL13, TL16, TL17, TL18

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Use of emerging technologies by students and staff is observable throughout the District
  1.3.2: Continue to offer online Technology staff development

LEA LRPT Correlates: EP01, EP03, EP04, EP05, EP08, EP09, EP11, EP12, TL01, TL02, TL03, TL05, TL07, TL08, TL18, TL19, TL20

State: Original

Status: In Progress

2006-2009 Lead Technology Facilitator Facilitators encourage the use of pdPoint by providing information about the system to teachers and enrolling participants.
  1.3.3: Increase the number of intermediate and advanced technology staff development sessions that are offered in the district

LEA LRPT Correlates: AS02, AS03, EP01, EP03, EP04, EP05, EP07, EP08, EP09, EP11, EP12, TL03, TL05, TL08

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Number of intermediate and advanced Technology sessions continually increases. Staff who previously completed local Technology training requirements outside of the District instead take advantage of GPISD-offered Technology staff development sessions
  1.3.4: Continue to add technology staff development sessions designed to meet the needs of non-teaching district personnel

LEA LRPT Correlates: AS03, EP01, EP09, EP11, EP12, TL03, TL05, TL08

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Increase in number of technology sessions for non-teaching district personnel. Staff who previously completed local Technology training requirements outside of the District instead take advantage of GPISD-offered Technology staff development sessions
  1.3.5: Explore the possibility of bringing outside technology instructors and speakers to GPISD to provide greater variety of technology staff development course offerings

LEA LRPT Correlates: EP01, EP03, EP05, EP08, EP09, EP12, TL20

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Technology instructors and speakers are brought to the GPISD on an as needed basis
OBJECTIVE 1.4:   Prepare new teachers to use available technologies in the GPISD

Budget Amount $30,500.00
LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02
NCLB Correlates: 01, 02, 03, 04a, 04b

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  1.4.1: The New Teacher Academy will provide one day of training to familiarize participants with district technology infrastructure, procedures, and guidance in accessing and utilizing district resources.

LEA LRPT Correlates: AS03, EP01, EP08, EP09, EP12, TL05

State: Original

Status: Planned

2006-2009 Executive Director of Technology and Lead Technology Facilitator New Teacher Academy schedule of events

GOAL 2: Develop leadership in the use of technology
OBJECTIVE 2.1:   Increase communication

Budget Amount $175,000.00
LRPT category: Teaching and Learning

E-Rate Correlates: ER01
NCLB Correlates: 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  2.1.1: Encourage technology facilitator input and cooperation with Campus Improvement Committees.

LEA LRPT Correlates: AS01, AS02, EP13, EP14, I01, I08, I09, TL09, TL11

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Campus Improvement Committees include a Technology Facilitator and/or recommendations from a Technology Facilitator regarding strategies for using technologies to accomplish goals and objectives stated in campus plan.
  2.1.2: Increase collaborative efforts of Technology and Curriculum & Instruction departments

LEA LRPT Correlates: AS01, EP05, EP13, EP14, I01, I08

State: Original

Status: In Progress

2006-2009 Lead Technology Facilitator and Assistant Superintendent of Curriculum & Instruction Increased communication, meetings, and collaborative decision-making between the two departments and closer correlation of technology staff development course offerings to district- and state-adopted curriculum.
  2.1.3: Communicate student cybersafety information to parents and community members when requested.

LEA LRPT Correlates: AS05, I09, I15, TL19

State: Original

Status: In Progress

2006-2009 Executive Director of Technology Student cybersafety information presentations during PTA meetings and other parent/community assemblies.
OBJECTIVE 2.2:   Promote innovative uses of instructional technologies

Budget Amount $300,000.00
LRPT category: Teaching and Learning

E-Rate Correlates: ER01, ER02
NCLB Correlates: 01, 02, 03, 04a, 04b, 07, 08, 10, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  2.2.1: Establish a GPISD Technology Foundation to support teachers who are utilizing sound instructional practices using technology and want to add resources to increase learning

LEA LRPT Correlates: AS01, AS02, AS07, EP05, TL05, TL20

State: Original

Status: Planned

2006-2009 Executive Director of Technology GPISD Technology Foundation is established, coordinated, and promoted by GPISD Technology department
  2.2.2: Convene Vertical Alignment Teams to identify and link technology-infused lessons and activities to the online curriculum, including adult literacy service providers

LEA LRPT Correlates: AS03, EP03, EP04, EP05, EP08, TL01, TL02, TL05, TL07, TL08, TL19

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator, Curriculum and Instruction Facilitators Technology resources are linked throughout the District online curriculum
  2.2.3: Allow participants to create and exchange ideas in a lesson plan database

LEA LRPT Correlates: EP03, EP04, EP05, EP07, EP09, TL01, TL03, TL05, TL07, TL08

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Lesson plan database contains expanding number and variety of instructional ideas, resources, and suggestions.
  2.2.4: Offer vendor fairs to inform educators of emerging technologies and applications

LEA LRPT Correlates: AS07, EP05, TL19

State: Original

Status: Planned

2006-2009 Executive Director of Technology Vendor fairs and scheduled and promoted by District Technology department
  2.2.5: Provide forums for the exchange of ideas and information related to the infusion of technologies with lessons and other classroom learning activities.

LEA LRPT Correlates: EP04, EP05, EP08, EP09, EP12, TL05, TL08, TL19, TL20

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Lesson plan database contains expanding number and variety of instructional ideas, resources, and suggestions. Successful lessons are showcased in meetings, newsletters, webpages, etc
OBJECTIVE 2.3:   Increase technology competencies of all GPISD employees

Budget Amount $30,000.00
LRPT category: Teaching and Learning

E-Rate Correlates: ER01, ER02
NCLB Correlates: 01, 04b, 11

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  2.3.1: Rewrite all GPISD job descriptions to specify required technology competencies

LEA LRPT Correlates: AS03, EP10, TL13, TL15

State: Original

Status: Planned

2006-2009 Executive Director of Technology and Assistant Superintendent of Human Resources All GPISD job descriptions specify technology competencies
  2.3.2: Identify campus experts who will share ideas for engaging lessons with technologies

LEA LRPT Correlates: AS07, EP05, EP08, EP09, EP12, TL03, TL05, TL08, TL19, TL20

State: Original

Status: Planned

2006-2009 Campus Technology Facilitators Campuses schedule teacher discussions regarding potential of classroom technology use, new ideas, etc. Discussions are coordinated by facilitators but led by teachers.
  2.3.3: Send interested teachers to Texas Computer Education Association convention with stipulation that they return to share information in scheduled meetings or technology staff development sessions

LEA LRPT Correlates: EP01, EP03, EP04, EP05, EP08, EP09, EP11, EP12, TL01, TL03, TL05, TL08, TL20

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Following attendance at a convention or conference, participants are scheduled to share information with others on campus
OBJECTIVE 2.4:   Promote the safe, legal, and ethical use of technologies by students, faculty and staff members

Budget Amount $200,000.00
LRPT category: Teaching and Learning

E-Rate Correlates: ER01
NCLB Correlates: 01, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  2.4.1: Develop and distribute student cybersafety information

LEA LRPT Correlates: AS07, EP02, EP03, TL02

State: Original

Status: Planned

2006-2009 Lead Technology Facilitator Cybersafety information is developed and communicated to students
  2.4.2: Communicate student cybersafety information to parents and community members when requested.

LEA LRPT Correlates: AS05, I09, I15, TL19

State: Original

Status: In Progress

2006-2009 Executive Director of Technology Student cybersafety information presentations during PTA meetings and other parent/community assemblies.
  2.4.3: Annually review student and staff Acceptable Use Procedure.

LEA LRPT Correlates: AS03

State: Original

Status: Planned

2006-2009 Executive Director of Technology Updated procedure in place for each school year

GOAL 3: Administration and support services us of technology will be monitored, staffed, funded, and utilized at appropriate levels
OBJECTIVE 3.1:   GPISD will effectively plan and evaluate technology use and goals

Budget Amount $105,000.00
LRPT category: Administration and Support Services

E-Rate Correlates: ER01
NCLB Correlates: 02, 03, 05, 06, 07, 11

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  3.1.1: Completion of Texas STaR carts for all campuses. Incorporation of technology planning in campus improvement plans.

LEA LRPT Correlates: AS01, AS03, I01, I08, I13

State: Original

Status: Planned

2006-2009 Executive Director of Technology, Campus Principal Technology planning in documents, campus STaR charts complete
  3.1.2: Continuation of use of technology in planning and decision making. Investigate and deploy data tools for teachers.

LEA LRPT Correlates: AS01, AS02, AS03, AS08, I01, I08, TL12, TL15

State: Original

Status: Planned

2007 Administrative Council Software in place
  3.1.3: Continuation of technology plan evaluation during the next three years. Annual evaluation with reports to Superintendent and School Board as requested.

LEA LRPT Correlates: AS01, AS02, AS03, AS07, AS08, I01, I08, TL15

State: Original

Status: Planned

2006-2009 Executive Director of Technology Reports presented to the Superintendent and Board
  3.1.4: Yearly revision of both board policy and procedures dealing with technology. Revisions to include data retention procedures.

LEA LRPT Correlates: AS04, AS06

State: Original

Status: Planned

2006-2009 Executive Director of Technology Policy/procedure reviewed and changed
  3.1.5: The district will support and implement the Texas Long Range Plan for Technology in all short and long term planning.

LEA LRPT Correlates: AS01, AS07

State: Original

Status: Planned

2006-2009 Executive Director of Technology All plans (campus and district) will be inspected and aligned.
  3.1.6: Continue giving eighth grade post test to access technology skill aquisition on Technology TEKS. Evaluate data to modify instruction and staffing as needed.

LEA LRPT Correlates: TL14

State: Original

Status: Planned

2006-2009 Middle School Technology Facilitator Tests given and data evaluated
OBJECTIVE 3.2:   Administration will recommend staffing levels and tools for support of technology integration

Budget Amount $1,309,000.00
LRPT category: Administration and Support Services

E-Rate Correlates: ER01
NCLB Correlates: 02, 03, 04b, 06, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  3.2.1: Addition of one network person for student account maintenance.

LEA LRPT Correlates: AS08

State: Original

Status: Planned

2007 Executive Director of Technology Position in place and hired
  3.2.2: Recommendation for instructional staff: Elevation of computer lab aids to Instructional Technology Facilitators at Middle Schools. Addition of thirteen elementary facilitators for a 1 per campus staffing level.

LEA LRPT Correlates: AS04, AS08, EP05, EP07, EP12

State: Original

Status: Planned

2006-2009 Executive Director of Technology Positions in place
  3.2.3: Deployment of student Novell accounts and email. Development of procedures for use and monitoring. Development procedures for maintenance

LEA LRPT Correlates: AS03, AS06, AS07, TL02, TL18

State: Original

Status: Planned

2007-2008 Executive Director of Technology Student accounts and email in place
OBJECTIVE 3.3:   Administration will continue to seek and maintain funding for technology.

Budget Amount $0.00
LRPT category: Administration and Support Services

E-Rate Correlates: ER01
NCLB Correlates: 03, 05, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  3.3.1: Continued seeking of grants such as E-Rate, Title II Part D, and other competitive and noncompetitive grants.

LEA LRPT Correlates: I12

State: Original

Status: Planned

2006-2009 Executive Director of Technology Technology projects and department are sufficiently funded to integrate technology and maintain/enhance services
  3.3.2: Support of technology through federal, state, local monies, bonds and appropriate donations.

LEA LRPT Correlates: I12

State: Original

Status: Planned

2006-2009 Executive Director of Technology Technology projects and department are sufficiently funded to integrate technology and maintain/enhance services
OBJECTIVE 3.4:   GPISD Technology Department will continue support and enhancing services for employee, student, and parent use.

Budget Amount $110,000.00
LRPT category: Administration and Support Services

E-Rate Correlates: ER01
NCLB Correlates: 03, 05, 06, 08, 09, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  3.4.1: Deployment of VPN (Virtual Private Network) for administrators to access network services at home.

LEA LRPT Correlates: AS03

State: Original

Status: Planned

2007 Executive Director of Technology VPN in place and users trained
  3.4.2: Perform complete workflow/data flow analysis of district data.

LEA LRPT Correlates: AS02, AS08

State: Original

Status: Planned

2007 Executive Director of Technology Report to School Board
  3.4.3: Allow teachers to post web pages to the district site to increase communication with campus

LEA LRPT Correlates: TL21

State: Original

Status: Planned

2007-2008 WebMaster Web sites in place and procedures written
  3.4.4: Develop data retention policy for email and user accounts

LEA LRPT Correlates: AS03, AS04

State: Original

Status: Planned

2006-2007 Executive Director of Technology Policy in place

GOAL 4: GPISD will continue to enhance infrastructure for technology.
OBJECTIVE 4.1:   Utilize 2003 bond funds for infrastructure additions and enhancements.

Budget Amount $300,000.00
LRPT category: Infrastructure for Technology

E-Rate Correlates:
NCLB Correlates: 03, 06

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  4.1.1: Installation of fiber network and networking infrastructure for new campus.

LEA LRPT Correlates: I02, I10

State: Original

Status: Planned

2007 Executive Director of Technology Network in place
  4.1.2: Complete new elementary school with district specifications for wiring, workstations, and telephones.

LEA LRPT Correlates: I02, I10, I15

State: Original

Status: Planned

2007 Executive Director of Technology Wiring/network in place
OBJECTIVE 4.2:   Continued purchase and deployment of technology equipment to ensure equal and on demand access to technology.

Budget Amount $1,950,000.00
LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01
NCLB Correlates: 03, 05, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  4.2.1: Increase the student to computer ratio to 3:1. Continued investment in wireless computer labs at all sites. Research and deploy additional computers in teachers' classrooms as needed for student use.

LEA LRPT Correlates: AS07, I03, I05, I14

State: Original

Status: Planned

2006-2009 Executive Director of Technology Computer ratio at acceptable levels
  4.2.2: Research and possible hiring of an adaptive device specialist to be shared with the Special Education Department. Position to work with both departments for optimal use, compatibility, and training of devices.

LEA LRPT Correlates: TL10

State: Original

Status: Planned

2007 Director of Special Ed., Executive Director of Technology Position in place
  4.2.3: Continue deployment of teacher machines to continue 1:1 ratio

LEA LRPT Correlates: I02, I03, I04, I10

State: Original

Status: Planned

2006-2009 Executive Director of Technology Machines in place
  4.2.4: Continue maintenance and support of equipment (network, machines, telephone)

LEA LRPT Correlates: I02, I03, I06, I07, I10, I14

State: Original

Status: Planned

2006-2009 Executive Director of Technology Equipment functions
  4.2.5: Continue updating and expanding library computer inventories to increase access and research skills.

LEA LRPT Correlates: AS01, AS06, EP06, I01, I02, I07

State: Original

Status: Planned

2006-2009 Executive Director of Technology, Library Facilitator Increased number of computers
OBJECTIVE 4.3:   Plan possible 2006 bond issue

Budget Amount $0.00
LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01
NCLB Correlates: 03, 04b, 05, 06, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  4.3.1: Participate and plan items to be included in possible 2006 bond.

LEA LRPT Correlates: AS05, AS06, I02, I03, I04, I05, I06, I07, I09, I10, I14, I15

State: Original

Status: Planned

2006 Executive Director of Technology Bond items go to voters
  4.3.2: Develop plan for student lab and teacher computer replacement.

LEA LRPT Correlates: I02, I03, I04, I05, I06, I07, I08, I10, I12, I14, I15, TL01, TL08, TL18, TL19, TL21

State: Original

Status: Planned

2006-2007 Executive Director of Technology Plan developed and approved by Board
  4.3.3: Develop strategy and replace for Wan/Lan for all district sites

LEA LRPT Correlates: I02, I03, I10, I11, I12, I14, I15, TL17, TL18, TL19

State: Original

Status: Planned

2006-2007 Executive Director of Technology Hardware in place
  4.3.4: Develop plan for computer projectors in computer labs and science labs. Investigate need for classroom projectors

LEA LRPT Correlates: AS06, AS08, I02, I03, I11, I12, I14, TL01, TL02, TL05, TL06, TL08

State: Original

Status: Planned

2006 Executive Director of Technology Plans developed and projectors in place in designated areas.
  4.3.5: Develop solution for power back-ups at network core sites

LEA LRPT Correlates: I10, I15

State: Original

Status: Planned

2006-2007 Executive Director of Technology Plan in place and equipment funded
  4.3.6: Monitor and recommend relationship changes (withdrawing from mainframe group) with Region X information services for business and student data services

LEA LRPT Correlates: AS03, AS07

State: Original

Status: Planned

2006-2009 Executive Director of Technology Annual reports to Superintendent
  4.3.7: Enhance PBX phone system and explore increasing number of IP phones

LEA LRPT Correlates: I02

State: Original

Status: Planned

2006-2009 Network Administrator - Telephones Telephone system working to maximum efficiency.
  4.3.8: Implement IPTV solution to campuses for live events and recorded media from the Education Center. Investigate other services for additional desktop video services (i.e. United Streaming and others)

LEA LRPT Correlates: AS07, TL16, TL18

State: Original

Status: Planned

2007 Executive Director of Technology Services in place
  4.3.9: Implement a data warehouse approach for quicker, easier access to student data.

LEA LRPT Correlates: AS02, AS03, AS07

State: Original

Status: Planned

2008 Executive Director of Technology Systems in place
  4.3.10: Explore implementing 1:1 device to student ratio at Grades 3-12.

LEA LRPT Correlates: I04, I05, TL01

State: Original

Status: Planned

2006-2007 Executive Director of Technology Plan rejected or accepted for proposal.

GOAL 5: Increase involvement with parent and community
OBJECTIVE 5.1:   Facilitate parent participation with technology applications

Budget Amount $15,000.00
LRPT category: Administration and Support Services

E-Rate Correlates: ER01
NCLB Correlates: 09

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  5.1.1: Enhance the parent portion of the district web page

LEA LRPT Correlates: TL21

State: Original

Status: Planned

2006-2008 Web Master Parent links on web page increase
  5.1.2: Redevelop parent password site for on-line grade book access

LEA LRPT Correlates: I15, TL21

State: Original

Status: Planned

2006 Executive Director of Technology New password web site in place
  5.1.3: Develop a parent web portal to consolidate all parent information sites

LEA LRPT Correlates: I15, TL21

State: Original

Status: Planned

2007-2008 Executive Director of Technology Web portal in place
  5.1.4: Give access to School Messenger emergency telephone communication system to all campuses

LEA LRPT Correlates: I15

State: Original

Status: Planned

2006 Executive Director of Technology All schools using School Messenger system
OBJECTIVE 5.2:   Faclitate GPISD Technology Department involvement with the community

Budget Amount $7,500.00
LRPT category: Infrastructure for Technology

E-Rate Correlates:
NCLB Correlates: 09, 10

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:
  5.2.1: Enhance content of GPISD-TV - channel 76

LEA LRPT Correlates: I15

State: Original

Status: Planned

2006-2008 Director of Communications More programs develop for the community
  5.2.2: Incorporate language software into adult literacy classes at Title I campuses and Title I programs offering literacy instruction

LEA LRPT Correlates: TL21

State: Original

Status: Planned

2006-2008 Executive Director of Student Support Services and Executive Director of Technology Software in place
  5.2.3: Enhance GPISD Foundation web site to incorporate credit card donations

LEA LRPT Correlates: I15, TL21

State: Original

Status: Planned

2007 Foundation Chairperson and Executive Director of Technology Credit card payment in place
  5.2.4: Continue offering computer literacy classes (Spanish and English) as requested by campuses

LEA LRPT Correlates: I15

State: Original

Status: Planned

2006-2008 Campus principal and Executive Director of Technology Classes sizes and amount of classes increase


Budget

Total amount of Title II, Part D formula funds received for the current year of this plan: $71,500.00

Method of application for formula funds: Local Application

Budget year 2006

Budget item Cost Funding Sources with amount per source
Staff Development $203,000.00 18000-Title II Part D
185000-state allotment
Telecommunications & Internet Access $413,000.00 413000-Local funds
Materials & Supplies $100,000.00 100000-Local funds
Equipment $375,000.00 275000-Bond funds
100000-Local funds
Maintenance $830,000.00 830000-Local funds
Miscellaneous Expenses $100,000.00 100000-Local funds
Total $2,021,000.00

Budget year 2007

Budget item Cost Funding Sources with amount per source
Staff Development $203,000.00 18000-Title II Part D
185000-state allotment
Telecommunications & Internet Access $413,000.00 413000-Local funds
Materials & Supplies $100,000.00 25000-Local Funds
Equipment $100,000.00 90000-Tech Allotment
10000-Local funds
Maintenance $830,000.00 830000-Local funds
Miscellaneous Expenses $131,350.00 100000-Local funds
7500-Title I
Total $1,777,350.00

Budget year 2008

Budget item Cost Funding Sources with amount per source
Staff Development $203,000.00 18000-Title II Part D
185000-state allotment
Telecommunications & Internet Access $413,000.00 413000-Local
Materials & Supplies $25,000.00 25000-Local Funds
Equipment $100,000.00 100000-state allotment
Maintenance $830,000.00 830000-Local funds
Miscellaneous Expenses $108,850.00 100000-Local funds
Total $1,679,850.00

Evaluation

Evaluation Process:
Evaluation of the Technology Plan will be a systematic ongoing process. All aspects of the Plan will be evaluated formally annually.


A subcommittee of the technology committee will be responsible for the ongoing evaluation and will utilize whatever resources deemed necessary in the process. The type of evaluation, and the detail, will depend on the part of the Plan being evaluated. The intention of the evaluation will be to make decisions on the impact that technology has on the learning process for all students. A report will be given to the Superintendent and the Board of Trustees after each formal evaluation occurs. After evaluation the Executive Director of Technology and Information will make all necessary changes in the e-Plan system. Particular attention will be paid to Objective 4.3, as the bond planning process will dictate many parts of the plan in year 2 and 3.


Grand Prairie ISD’s STaR Chart results will be used to help Grand Prairie ISD assess its progress toward meeting the goals of the Long Range Plan for Technology. The STaR chart will also be used to compare Grand Prairie ISD’s results with other Texas districts. By using the STaR chart as a monitoring tool, Grand Prairie ISD will be able to accurately assess technical growth on an annual basis.

Evaluation Method:
Integrating technology into curriculum and instruction


Classroom observations of effective teaching practices combined with the use of technology to support student learning.

Lesson plans that include effective teaching practices as part of instructional procedure.

Formative PDAS observation records regarding student learning (which includes use of instructional technology).

Improved student participation, attention, and completion of classroom assignments.

Positive participant evaluations following technology staff development session.

Increased integration of individualized, relevant and interesting technology into classroom instruction.

Lesson plans that reflect learning gleaned in technology staff development sessions.

Increased integration of individualized, relevant and interesting technology into classroom instruction.

Lesson plans that reflect learning gleaned in technology staff development sessions.


Increasing the ability of teachers to teach


Formative PDAS observation records regarding student learning (which includes use of instructional technology).

Improved student participation, attention, and completion of classroom assignments.

Positive participant evaluations following technology staff development session.

Documentation of student acknowledgment of GPISD’s Acceptable Use Procedures as outlined in handbook.

Documentation of student acknowledgement of GPISD’s Acceptable Use Procedures.

Increased integration of individualized, relevant and interesting technology into classroom instruction.

Lesson plans that reflect learning gleaned in technology staff development sessions.

Increased professional collaboration resulting from forums.


Enabling students to meet challenging state academic standards


Increased use of technology by administrators and teachers for data tasks.

Increased integration of technology will increase higher-level thinking resulting in better scores

TAKS benchmarking decisions made by Superintendent regarding online testing

Monitoring of legislative action regarding school funding


Acquiring and deploying technologies and telecommunication services


Monitoring of budget and services being rendered to staff

Services delivered in an incremental approach to maximize efficiency

Systems decrease user frustration to accessing data and systems


Meeting timelines for implementation


Increased physical evidence of technology use (bulletin boards, classroom instruction, student work posted in school hallways, etc.). To be monitored by campus principal.

Meeting with campus staff regarding technology planning

Reports to Board of Trustees and Superintendent


GRAND PRAIRIE ISD does not discriminate on the basis of sex, disability, race, color, age, or national origin in its educational programs, activities, or employment as required by Title IX, Section 504 and Title VI.